Session 1: Maintenance of an isolator in hospital pharmacy: periodical inspections and qualifications
3 October 2018
Dr P. Hild, Roanne Hospital, FranceD. Meyer, DM Compliance, Chevreuse, France
Pr F. Sadeghipour, CHUV, Lausanne, Switzerland
An Isolator once installed and qualified to be operational, needs to be maintained regularly throughout its whole lifetime. Moreover, some maintenances or repairs require partial or complete verifications of its performances, leading to a requalification.
Therefore, it is important to know the mandatory preventive maintenances for an isolator, in order to determine when a requalification is needed and to not miss any regulatory or inspection point. This workshop will deal in detail with these topics.
Dr P. Hild, Roanne Hospital, France
D. Meyer, DM Compliance, Chevreuse, France
Pr F. Sadeghipour, CHUV, Lausanne, Switzerland